What this document does
Puts a home renovation, repair or improvement job on paper between the owner and the contractor: the site and a line-item scope, milestone-linked payments where each instalment falls due only on completed work — never by date alone, the antidote to the big-advance-then-abandonment pattern — materials with named brands and substitution only by written consent, site access and working hours for an occupied home, a timeline with a grace period and then the owner's remedies, an abandonment clause letting the owner complete through others and set off the cost, a defect-liability period after handover, and statutory, safety and debris obligations with no structural change until permissions exist. Works plus materials plus a defect tail is a different promise from pure services: for services alone — design, consulting, freelancing — use the Freelance / Service Agreement; for a defective job already paid for without a contract, the Consumer Defect notice is the after-the-fact instrument.
Price
Your answers stay in this browser tab until you continue. Free to draft — you only pay when you send it.
Draft · not yet executed
Small Works Contract
0/9 answered
What else is in it — 11 clauses, 1 optional
- 01
Introduction
The preamble: date and place, the Owner and Contractor with the recital wording their entityType selects, and the recitals stating that this is a works engagement — scope, milestone-paid price, materials, timeline and defect liability recorded below.
- 02
The Site and the Scope of Works
Identifies the site and pins the scope: a one-line description of the job, the line-item list of works rendered as bullets, any quotation or drawings read with the Agreement (the Agreement prevailing on conflict), and the variation discipline — no change to scope except by a written variation signed by both sides stating its effect on price and time.
- 03
Price, Milestones and Payment
The money spine, and the antidote to the big-advance-then-abandonment pattern: the Contract Price, an optional acknowledged mobilisation advance, and either a milestone ladder — each instalment falling due only when the work it is tied to is complete, never by date alone — or full payment on completion. GST and invoicing handled by a flag; withholding confined to the milestone in dispute.
- 04
Materials
Who supplies what, to what specification: contractor-supplied, owner-supplied, or split; the brand and specification list rendered as bullets; substitution only with the Owner's prior written consent and only for equal or better at no extra cost; owner-supplied materials in the Contractor's care with wastage accounted for.
- 05
Site Access and Manner of Working
The daily terms of an occupied home: access on stated days and hours for the Works alone, an identified workforce, care of the premises and neighbours, compliance with society rules, use of the Owner's water and electricity for the Works, and the work area kept orderly day to day.
- 06
Timeline, Grace and Delay
The clock: the start date, the completion period, a grace period after it, and then the Owner's remedies — an optional per-day delay deduction capped at a tenth of the price, and termination on written notice. Extensions only in writing, and only for the Owner's own delay, written variations, or events beyond the Contractor's control.
- 07
Abandonment and Termination
The clause the milestone ladder backs up: unexplained absence from the Site for a set number of days is abandonment; after a written notice to resume goes unanswered, the Owner may terminate, have the Works completed by others, and set the completion cost off against the unpaid balance — recovering any shortfall. Mutuality: the Contractor may suspend after notice if a due instalment stays unpaid.
- 08
Completion, Handover and Defect Liability
The tail that outlives the handover: completion recorded by joint inspection with a punch list, and a defect-liability period — conventionally six to twelve months — during which the Contractor returns to rectify notified defects at its own cost within a set number of days, failing which the Owner rectifies through others and recovers the cost. Fair wear and tear and misuse excluded; product warranties handed over.
- 09
Compliance, Safety and the Workforce
The boundary conditions: statutory and safety compliance is the Contractor's; the workforce is the Contractor's alone — wages, safety equipment and compensation for injury included; no structural change or work needing municipal or society permission until the permission exists; debris leaves the Site and the Site is handed back clean; independent contractor, not employment.
- 10
Governing Law and Dispute Resolution
Applicable law, jurisdiction, and dispute resolution mechanism (courts or arbitration under Indian law).
- 11
General Provisions
The closing machinery: entire agreement, written amendments, notices, severability, no waiver by indulgence, counterparts, who bears the stamp duty, and the parties' remedies under consumer-protection law expressly preserved.
After it is drafted
Get the stamp paper
Buy non-judicial stamp paper of the value your state prescribes, and print the document on it.